AEE Energy Management CEM Question # 14 Topic 2 Discussion

CEM Exam Topic 2 Question 14 Discussion:
Question #: 14
Topic #: 2

A facility has the thermal cooling load profile shown in the table below. The utility rate traffic has an no-peak time-of-use period that begins at 10:00 a.m ends at 7:00 p.m. What chiller capacity (output) is required for a load-leveling operating strategy?

CEM Question 14

[Question from the previous image, which was about chiller capacity for load leveling, but the table was missing]


A.

4.0 GJ/h


B.

5.0 GJ/h


C.

7.0 GJ/h


D.

8.0 GJ/h