As-built drawings are a critical part of the project closeout process as they provide an accurate depiction of the actual construction versus the original design. These drawings incorporate all modifications, field changes, and deviations from the original design that occurred during construction.
Accuracy of Construction Details – The drawings must capture all deviations from the original plans, including changes in dimensions, materials, or layouts.
Compliance with Final Project Conditions – They should reflect the actual completed facility, including underground utilities, structural modifications, and system placements.
Integration with Maintenance and Operations – Proper as-built documentation supports future maintenance, repairs, and facility modifications.
Regulatory and Safety Compliance – Must include annotations related to safety considerations, fire protection systems, and access points.
Key Factors in Evaluating As-Built Drawings:Without accurate as-built drawings, future renovations, inspections, or repairs can be problematic, leading to costly errors and inefficiencies.
References:
QA Library
DCS QA
Contribute your Thoughts:
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit