CTS-I Exam Topic 8 Question 79 Discussion:
Question #: 79
Topic #: 8

If you are installing a ceiling mount that requires a pipe, what should you do after you mount the pipe flange to the adjustable ceiling mount?


A.

Thread the pipe into the pipe flange and carefully cut the ceiling tile into two pieces. Then reinstall the pieces of ceiling tile into the ceiling grid leaving enough space for the pipe to protrude.


B.

Reinstall the ceiling tile and use a plumb bob to locate the spot on the ceiling tile directly below the center point of the pipe flange.


C.

Using the proper hardware, install the load bar to the cross members of the adjustable ceiling mount.


D.

Thread the pipe into the pipe flange and gently push the ceiling tile over the pipe, so that the pipe protrudes through the ceiling tile.


Get Premium CTS-I Questions

Contribute your Thoughts:


Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.