Which of the following scenarios would MOST likely violate the code requirements related to fire-stopping as identified in BICSI Installer 2 best practices?


A.

Using permanently intumescent sealant around cable bundles passing through a fire-rated wall


B.

Pulling a cable bundle through an existing firestop without re-sealing around the annular space


C.

Installing cable through a listed firestop assembly for electrical conduit


D.

Using a split sleeve design specifically tested for the cable type