Post-implementation deliverables serve to document the final WLAN design, configuration, and layout for the customer’s operational and maintenance teams. The CWDP-305 Study Guide identifies essential deliverables that ensure long-term support, change management, and troubleshooting.
These include:
Floorplans with AP placements and coverage zones
Design documents specifying SSID configuration, channel plans, and power levels
WLAN configuration exports or screenshots for controllers/APs
Inventory lists of installed equipment (serial numbers, models, etc.)
Guides or SOPs for routine WLAN tasks
Providing this documentation is a professional best practice that aligns with design transparency, customer service, and lifecycle management. It enables future audits, upgrades, or expansions while ensuring continuity even if personnel changes.
[Reference: CWDP-305 Study Guide, Chapter on Wireless Design Process – “Customer documentation and deliverables”, , , ]
Submit