Joan was conducting a particular disaster recovery test in her startup. In this test, the effectiveness, bottlenecks, or any weaknesses in the plan had to be confirmed by the team members. Which test was Joan conducting?
Walkthrough Testing involves team members reviewing the DR plan in a structured discussion to confirm effectiveness, identify bottlenecks, and uncover weaknesses, as Joan did.
Option B (Full Interruption):Live shutdown test, not discussion-based.
Option C (Parallel):Runs recovery alongside primary, not weakness-focused.
Option D (Simulation):Mimics disasters, not confirmation-based.
“Walkthrough Testing engages team members to validate DR plan effectiveness and pinpoint weaknesses through detailed review” (Module: Testing Disaster Recovery Plans, Section: Test Types).
Contribute your Thoughts:
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit