Question #: 13
Topic #: 2

The customer requires two Aruba CX 6200F 48G switches to be connected to each other with a distance of 80m/252ft between wiring closets. Switches need to have reservation for VSF expansion with ring

topology in each cabinet.

What is a valid configuration for a redundant link-aggregation port configuration?


A.

Ports 1/1/49 and 1/1/50 with SFP28 for LAG


B.

Ports 1/1/47 and 1/1/48 for LAG


C.

Ports 1/1/1 and 1/1/2 for LAG


D.

Ports 1/1/51 and 1/1/52 with SFP+ for LAG