Question #: 4
Topic #: 1

The stakeholders in a new system want its mean time between failure to be three months or longer, with a mean time to repair the system of ten minutes or less when it does fail. When planning and specifying reliability tests to be performed before release, which ONE of the following is a factor that must be considered?


A.

Defining the replaceability requirements


B.

Determining the target availability for the system


C.

Monitoring reliability in production


D.

Configuring a production-like test environment