When evaluating risks, both the likelihood of failure and the potential cost of impact must be considered. The risk with the highest level is determined by the product of these two factors. In this case, a 10% likelihood of failure with a potential cost of impact of $500,000 results in a higher risk (expected impact) compared to the other options. The expected impact is calculated as likelihood multiplied by impact, which is higher for option B​​.