You are preparing to install a new 2-node AFF A250 system at a customer site with an existing cluster that uses NetApp CN1610 cluster interconnect switches.

In this scenario, what are two valid actions for this installation? (Choose two.)


A.

Add the new nodes to the existing cluster and switches.


B.

Create a new 2-node switched cluster that uses the CN1610 cluster switches.


C.

Create a new 2-node switchless cluster.


D.

Migrate the existing cluster to new switches and add the new nodes.