The exhibit shows a Prism Pro scenario result created by an administrator for a Nutanix cluster.
The physical nodes in the cluster include these characteristics:
144 GHz CPU power
3 Tib RAM
41.63 TiB storage
The total target workload requests are:
5 Ghz CPU
10 GB RAM
40 TiB storage
What should be changed to have a good capacity runway at least for the next 6 months?
Submit