In the As-Built Guide for an AHV cluster deployment with each node configured with four NICs, the consultant should manually update:
A. Node Port Layout Diagram: To reflect the physical connectivity and usage of each NIC on the nodes.
B. Network Cabling Diagram: To accurately document how each node is connected to the network infrastructure, ensuring clarity on physical network setup.
References:
Nutanix Bible (https://www.nutanixbible.com ), where documentation standards and diagrams are emphasized.
Nutanix University: NCS-Core 6.8 Training (https://university.nutanix.com ), covering the importance of accurate network and port documentation in deployment guides.
Contribute your Thoughts:
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit