PECB ISO 27001 ISO-IEC-27001-Lead-Auditor Question # 100 Topic 11 Discussion

ISO-IEC-27001-Lead-Auditor Exam Topic 11 Question 100 Discussion:
Question #: 100
Topic #: 11

An audit team leader is planning a follow-up audit after the completion of a third-party surveillance audit earlier in the year. They have decided they will verify the nonconformities that require corrections before they move on to consider corrective actions.

Based on the descriptions below, which four of the following are corrections for nonconformities identified at the surveillance?


A.

A signature missing from a client's contract for the supply of data services was added


B.

A software installation guide which had not been sent to the client along with their new system was posted out


C.

An incorrectly dated purchase order for a new network switch was rectified


D.

Data centre staff not carrying out backups in accordance with specified procedures were retrained


E.

Hard drive HD302 which had been colour-coded green (available for use) instead of red (to be destroyed) was removed from the system


F.

Scheduled management reviews, having been missed, were prioritised by the General Manager for holding on a specific date twice each following year


G.

The documented process for product shipment, which did not reflect how this activity was conducted by the despatch team, was re-written and the team trained accordingly