Physical design decisions document specific details about component placement and sizing in the infrastructure. Deploying Remote Collectors in each location and specifying the analytics cluster size (three Large nodes) are concrete, implementation-level details that belong in the physical design.
Contribute your Thoughts:
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit