Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

Pass the iSQI Technical Test Analyst CTAL-TTA_Syll19_4.0 Questions and answers with ValidTests

Exam CTAL-TTA_Syll19_4.0 All Questions
Exam CTAL-TTA_Syll19_4.0 Premium Access

View all detail and faqs for the CTAL-TTA_Syll19_4.0 exam

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

Consider the pseudo code for the Answer program:

Question # 1

Which of the following statements about the Answer program BEST describes the control flow anomalies to be found in the program?

Options:

A.

The Answer program contains no control flow anomalies.

B.

The Answer program contains unreachable code.

C.

The Answer program contains unreachable code and an infinite loop.

D.

The Answer program contains an infinite loop.

Questions # 2:

Below is the pseudo-code for the Win program:

Question # 2

The bingo program contains a data flow anomaly. Which data flow anomaly can be found in this program?

Options:

A.

Variable 'A" is not assigned a value before using it.

B.

Variable 'D" is defined but subsequently not used.

C.

The program does not contain any comments.

D.

It is recommended to use a variable instead of the hard-coded print results "Win" and *Loose".

Questions # 3:

You have been assigned to perform a review on code provided below:

Question # 3

Which type of defect should you report as part of the code review?

Options:

A.

Endless loop

B.

Unreachable code

C.

Too many nested levels

D.

No defects should be reported, code is correct.

Questions # 4:

You are working on an internet banking project. Your company is offering this product to the financial market. For each new customer, some customization will typically be needed. To make the product successful there is a strong focus during development on a reliable and maintainable architecture. To support architectural reviews, a checklist will be developed. Within the checklist specific sections will be attributed to reliability and maintainability.

Which question from the list below should you include in the maintainability section of the architectural review checklist?

Options:

A.

Will the system use n-version programming for critical components?

B.

Will the user interface be implemented independently from the other software modules?

C.

Does the system have user-friendly error messages?

D.

Does the password protection of the system adhere to the latest regulations?

Questions # 5:

At which test level would reliability testing most likely be performed?

Options:

A.

Static testing

B.

Component testing

C.

System testing

D.

Functional acceptance testing

Questions # 6:

The following characteristics were identified during an early product risk-assessment for a software system:

• the software system needs to manage synchronization between various processes

• microcontrollers will be used that will limit product performance

• the hardware that will be used will make use of timeslots

• the number of tasks supported in parallel by the software system is large and are often highly complex.

Based on the information provided, which of the following non-functional test types is MOST appropriate to be performed?

Options:

A.

Maintainability testing

B.

Security testing

C.

Time-behaviour testing

D.

Portability testing

Questions # 7:

Within an embedded software project, the maintainability of the software is considered to be critical. It has been decided to use static analysis on each delivered software component.

Which of the following metrics is NOT a maintainability metric typically used with static analysis?

Options:

A.

Number of Lines of Code (LOG)

B.

Number of Function Calls

C.

Mean Time Between Failures

D.

Comment Frequency

Questions # 8:

You are asked to provide a practical and pragmatic testing solution for a commercial system where the main user interface is via the Internet. It is critical that the company’s existing good name and market profile are not damaged in any way. Time to market is not a critical issue when appropriate testing solutions are identified to mitigate business risks.

A product risk assessment has revealed the following product risk:

• Abnormal application termination due to connection failure of the main interface.

Which of the following is the appropriate test type to address this risk?

Options:

A.

Performance efficiency testing

B.

Portability testing

C.

Reliability testing

D.

Operability testing

Questions # 9:

Consider the pseudo code provided below:

Question # 9

Given the following tests, what additional test(s) (if any) would be needed in order to achieve 100% statement coverage, with the minimum number of tests?

Test 1: A = 7, B = 7, Expected output: 7

Test 2: A = 7, B = 5, Expected output: 5

Options:

A.

A=6, B=12, Expected output: Bingo! and A=7, B=9, Expected output: 7

B.

A=6, B=12, Expected output: Bingo!

C.

A=7, B=9, Expected output: 7

D.

No additional test cases are needed to achieve 100% statement coverage.

Questions # 10:

Which of the following is a generic risk factor that should be considered by a Technical Test Analyst during a product risk analysis?

Options:

A.

Frequency of use of the affected feature by end-users.

B.

Complexity of new technology.

C.

Visibility of failure leading to negative publicity and potential image damage.

D.

High change rate of business requirements.

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions