Big Halloween Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Pass the Netapp NCIE SAN E-Series NS0-516 Questions and answers with ValidTests

Exam NS0-516 All Questions
Exam NS0-516 Premium Access

View all detail and faqs for the NS0-516 exam

Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions
Questions # 1:

Which two steps are required to enable multifactor authentication on an E-Series system? (Choose two.)

Options:

A.

Test SSO login

B.

Configure In-Band Management

C.

Map roles

D.

Configure LDAP

Expert Solution
Questions # 2:

Click the Exhibit button.

Question # 2

A customer has a raised floor with a weight limit of 700 lb. per floor tile. The customer’s data cabinet weights 90 lb. and covers a single floor tile.

Referring to the exhibit, what is the maximum number of E2824 shelves possible to be installed?

Options:

A.

22

B.

10

C.

6

D.

14

Expert Solution
Questions # 3:

A company implemented Automatic Load Balancing (ALB). When the controller workloads are monitored, it becomes obvious that there is an imbalance and that ALB is not working correctly.

In this scenario, what are two causes of the problem? (Choose two.)

Options:

A.

The company implemented a load balancing min-min algorithm that does not support ALB

B.

The company implemented an adaptive load balancing agent that does not support ALB

C.

The company implemented a host multipath driver that does not support ALB

D.

The company implemented a host type that does not support ALB

Expert Solution
Questions # 4:

What is the minimum number of drives needed to create a Dynamic Disk Pool?

Options:

A.

12

B.

8

C.

3

D.

11

Expert Solution
Questions # 5:

Click the Exhibit button.

Question # 5

An administrator is asked to create a 5532 GiB volume from the volume group.

Referring to the exhibit, how would the administrator complete this request?

Options:

A.

Create the volume after performing space reclamation

B.

Create the volume after consolidating the capacity

C.

Create the volume from the available capacity

D.

Create the volume after adjusting the preservation capacity

Expert Solution
Questions # 6:

A customer has launched a data analytics initiative and has been transferring old data into the new data lake. The customer has discovered some data read errors during the transfer process.

In this scenario, how should the customer have avoided these data integrity issues?

Options:

A.

by ensuring that data assurance and media scan are always activated

B.

by deploying secure-capable drives

C.

by turning on cyclic redundancy checks (CRCs)

D.

by turning on erasure coding

Expert Solution
Questions # 7:

A customer has an E5760 array with a 30-drive Dynamic Disk Pool (DDP) that uses 800 GB SSD drives. The customer needs to expand the pool by one drive but has only a 1.6 TB SSD drive available.

In this scenario, what happens when the customer attempts to add the 1.6 TB drive to the existing pool?

Options:

A.

The pool is expanded by 1.6 TB

B.

The pool is expanded by 1.6 TiB

C.

The pool is expanded by 800 GB

D.

An error occurs, and the add fails

Expert Solution
Questions # 8:

In which two locations would you find the WWPNs for a Windows host? (Choose two.)

Options:

A.

FC switch

B.

host’s BIOS

C.

Windows Device Manager

D.

HBA vendor’s utility

Expert Solution
Questions # 9:

Click the Exhibit button.

Question # 9

Referring to the exhibit, what would you select in the search list to see all of the host selections for NetApp E-Series storage systems?

Options:

A.

Storage OS

B.

SANtricity

C.

E-Series SAN Host

D.

E-Series Controller Firmware

Expert Solution
Questions # 10:

The NetApp E-Series system with a 32 Gb FC Host Interface Card (HIC) requires which type of fiber cable to connect to switches or to connect directly to hosts extending up to 100 meters?

Options:

A.

OM4

B.

OM3

C.

OM1

D.

OM2

Expert Solution
Viewing page 1 out of 2 pages
Viewing questions 1-10 out of questions