Questions # 41:

What defines how well, or to what level a solution needs to perform?

Options:

A.

Functional Requirements

B.

Non-Functional Requirements

C.

Testable Requirements

D.

Tangible Requirements

Questions # 42:

Which of the following is NOT an interest into which each DSDM role is grouped?

Options:

A.

Business

B.

Solution/Technical

C.

Management

D.

Maintenance

Questions # 43:

When should the quality of the evolving solution first be tesed?

Options:

A.

At the end of a Timebox

B.

At the end of a project.

C.

At the end of each increment

D.

As part of the iterative Development process

Questions # 44:

How is contingency typically managed in a DSDM project?

Options:

A.

Not needed in a DSDM project.

B.

Allowed adding a percentage to the high-level estimates.

C.

Managed by varying the features to be delivered.

D.

Managed by varying time and cost

Questions # 45:

Which of the following statements about the technical Coordinator role is true?

The technical Coordination provides the same function from a technical perspective as the Business Ambassador does from a business perspective.

The technical Coordinator is responsible for ensuring that the solution confirm to the requested technical standards.

Options:

A.

Only 1 is true

B.

Only 2 is true

C.

Both 1 and 2 are true

D.

Neither 1 or 2 is true

Questions # 46:

How should DSDM team measure progress?

Options:

A.

Through a project dashboard

B.

Based on what has been delivered at the end of a Timebox.

C.

Based on the completion of activities rather than the delivery of products

D.

Through an analysis of the Instrumental Success Factors.

Questions # 47:

Which of the following roles may be substituted for a Scrum Master?

Options:

A.

There has been significant research and up front analysis

B.

The optimal solution has been designed and contracted

C.

The problem is unclear and change is inevitable

D.

The problem and solution are well defined and stable

Questions # 48:

In a free format Timebox, when should reviews take place?

Options:

A.

During the Kick-Off phase

B.

Throughout the body of the Timebox.

C.

During the Close.Out phase

D.

After the Timebox has been completed

Questions # 49:

In what phase is it first established whether further investigation of the project is justified?

Options:

A.

Pre-Project

B.

Feasibility

C.

Foundations

D.

Evolutionary Development

Questions # 50:

Which of the following statements about the Project Approach Questionnaire (PAQ) are true?

    Should be revisited at the end of Foundations.

    Should be revisited each time Foundations is revisited.

Options:

A.

Only 1 is true

B.

Only 2 is true

C.

Both 1 and 2 are true

D.

Neither 1 or 2 is true