Questions # 1:

What is the clearance required between cabinets and the perimeter wall?

Options:

A.

2 ft

B.

4 ft

C.

6 ft

D.

8 ft

Expert Solution
Questions # 2:

Where should the entrance room be located within a data center?

Options:

A.

In the computer room

B.

In a separate building on the campus

C.

Adjacent to or in a secured space within the computer room

D.

Anywhere with easy access to the outside

Expert Solution
Questions # 3:

What is the ASHRAE TC 9.9 recommended range for static pressure in a data center?

Options:

A.

0.01-0.05 inches water gauge

B.

0.05-0.1 inches water gauge

C.

0.1-0.15 inches water gauge

D.

0.15-0.2 inches water gauge

Expert Solution
Questions # 4:

What is the clearance required between the cold aisle and the CRAC unit?

Options:

A.

2 feet

B.

4 feet

C.

6 feet

D.

8 feet

Expert Solution
Questions # 5:

What is the minimum slab floor to ceiling height recommended?

Options:

A.

12feetminimum

B.

14feetminimum

C.

15feetminimmum

D.

16feetminimum

Expert Solution
Questions # 6:

where should the vendor storage area be located?

Options:

A.

far away from loading dock

B.

inside data center

C.

offsite

D.

adjacent or near secured loading dock

Expert Solution
Questions # 7:

What is recommended size ratio of Secure Storage Area?

Options:

A.

5% of Computer Room Space

B.

10% or greater than Available Floor Space

C.

15-20% more than Computer Room's Cross Sectional Area

D.

10% of Computer Room's Net Square Footage

E.

None Of These

Expert Solution
Questions # 8:

where is the storage room located?

Options:

A.

away from computer room, adjacent to equipment entrance at data center

B.

next door to computing area

C.

outermost point of Data Centre

D.

Near Backup Generator

E.

All

Expert Solution
Questions # 9:

What is the distance from the bottom of the access floor to the bottom of the cable tray?

Options:

A.

6 inches

B.

7 inches

C.

8 inches

D.

9 inches

E.

10 inches

Expert Solution
Questions # 10:

What is minimum recommended generator fuel storage amount?

Options:

A.

enough to run 4 to 16 hours at full load

B.

enough to run 24 to 36 hours at full load

C.

enough to run 48-72 hours at full load

D.

enough to run up-to a week at full load

Expert Solution