What is the recommended fire suppression system for a data center?

Options:

A.

Water-based

B.

Gas-based

C.

Foam-based

D.

Powder-based

E.

None of the above

Expert Solution
Questions # 12:

When is a battery room required to have electrolyte spill containment and exhaust systems?

Options:

A.

when the battery weight exceeds 500 pounds

B.

When the ceiling suspended load capacity is below 20 pounds per square foot

C.

when the potential for outgassing hydrogen exists

D.

When corrosive fumes are detected in operation room

Expert Solution
Questions # 13:

why does the entrance room designer need to meet with each anticipated access provider?

Options:

A.

To determine their electrical, space, interface, and other facility requirements

B.

As an alternative approach to save cost

C.

To know about hardware requirement only

D.

none of above

Expert Solution
Questions # 14:

Apart from Power usage effectiveness or P U E, and Data center infrastructure Efficiency Or D C i E, what other standardized measurements are there for data center efficiency?

Options:

A.

None of The Above.

B.

Energy efficiency Ratio.

C.

Return temperature index.

D.

All of the above

Expert Solution
Questions # 15:

where should engineering offices be located?

Options:

A.

adjacent to equipment rooms they support

B.

in a separate building

C.

far away from the data center

D.

inside computer room

Expert Solution
Questions # 16:

What are the recommended grounding requirements for DC power systems?

Options:

A.

Single point ground

B.

Multiple point ground

C.

Distributed ground

D.

None of the above

Expert Solution
Questions # 17:

What is the Fourth Preference Regarding Utility Service?

Options:

A.

At least two circuits from one substation fed via alternative power grid

B.

Two balanced feeds with different voltages derived from a single distribution station

C.

One circuit from one substation, separate paths

D.

At least four circuits each from different distribution stations but fed via common feeders

Expert Solution
Questions # 18:

What electrical service feed options are there for a data center?

Options:

A.

Single Entrance/Single Pathway

B.

Single Entrance/Dual Pathway

C.

Dual Entrance/Dual Pathway

D.

All of the above

Expert Solution
Questions # 19:

What is the clearance required between AC units?

Options:

A.

Min. of 2 ft but recommended 6 ft.

B.

Min. of 4 ft but recommended 6 ft.

C.

Min. of 6 ft but recommended 8 ft.

D.

Min. of 8 ft but recommended 10 ft.

Expert Solution
Questions # 20:

What is the NEBS GR-3028-CORE recommended operational temperature.

Options:

A.

-25°F to +125°F (-32°C to +52°C)

B.

-30°F to +110°F (-34°C to +43°C)

C.

-20°F/-28° C minimum and up to a maximum of104 ° Fahrenheit/40° Celsius

D.

Up To140 Degrees Fahrenheit /60 Degrees Celsius