For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a
Chosen Answer:
This is a voting comment (?). You can switch to a simple comment. It is better to Upvote an existing comment if you don't have anything to add.
Submit