An engineer changed the TPC Power Threshold for a wireless deployment from the default value to -65 dBm. The engineer conducts a new post-deployment Survey to validate the results. What is the expected outcome?
Changing the TPC Power Threshold to -65 dBm would generally result in a decrease in the transmit power of APs to maintain a smaller cell size. This helps in reducing interference and improving overall network performance. A lower threshold means the APs reduce their power to ensure the signal does not exceed -65 dBm, leading to decreased signal strength at the client side.