A technician installed a Cat 5 UTP cable approximately 275ft (84m) from a network switch in an office to a workstation located on a factory floor The technician sees both a flashing green LED and a flashing orange LED on the workstation's NIC. Which of the following should the technician do FIRST?


A.

Check for loose connections, pinched bends, and physical damage.


B.

Install a powered hub as close as possible to the halfway point in the Cat 5 UTP cable run.


C.

Replace the entire run of Cat 5 UTP cable with Cat 5 STP cable.


D.

Upgrade the entire cable run to multimode fiber.