You have a batch workload that runs every night and uses a large number of virtual machines (VMs). It is fault- tolerant and can tolerate some of the VMs being terminated. The current cost of VMs is too high. What should you do?


A.

Run a test using simulated maintenance events. If the test is successful, use preemptible N1 Standard VMs when running future jobs.


B.

Run a test using simulated maintenance events. If the test is successful, use N1 Standard VMs when running future jobs.


C.

Run a test using a managed instance group. If the test is successful, use N1 Standard VMs in the managed instance group when running future jobs.


D.

Run a test using N1 standard VMs instead of N2. If the test is successful, use N1 Standard VMs when running future jobs.