Question #: 30
Topic #: 4

Identify the missing word(s) in the following sentence:

The definition of [?] is a control point, following delivery of a step-change in capability and benefits realization (tranche), at which a programme can be re-directed or closed.


A.

a project


B.

a landing point


C.

a


D.

an incremental progression