Questions # 21:

Which source is used in fiber cable to transmit data?

Options:

A.

Signals

B.

Electric

C.

Light

D.

Pulse

Questions # 22:

Which Class of Fires involves energized electrical equipment?

Options:

A.

Class A

B.

Class B

C.

Class C

D.

Class K

Questions # 23:

What is a potential risk when using floor mounted cool air ducting systems?

Options:

A.

The neighboring racks could have a potential cooling impact.

B.

There are no risks when using floor mounted cool air ducting systems.

C.

Using floor mounted cool air ducting systems will increase the Computer room relative humidity.

D.

Using floor mounted cool air ducting systems will increase the Computer room temperature

Questions # 24:

Where should exit/emergency signs be located?

Options:

A.

Depends on the policy of the data centre

B.

At every escape door and pathways leading to doors (arrows)

C.

In the Computer room only

D.

At each door

Questions # 25:

Which one of the following is an Objective of Data Center Fire Protection?

Options:

A.

Information

B.

Representation

C.

Depression

D.

Suppression

Questions # 26:

Which one of the following is a Natural Disaster?

Options:

A.

Grid Failure

B.

Blackouts

C.

Hurricanes

D.

Human Error

Questions # 27:

The expected time to Recover/Repair from a system from a failure is defined as.

Options:

A.

MTBF

B.

MCBF

C.

MLBF

D.

MTTR

Questions # 28:

What is the main risk for a data centre when the water supply fails?

Options:

A.

Failure to the water supply could result in IT failure and/or denial of access to operate.

B.

Failure to the water supply could result in DX cooling systems to fail.

C.

Failure to the water supply could cause issues for the cooling of back-up generators.

D.

Failure to the water supply could result in sudden changes of the relative humidity in the Computer room.

Questions # 29:

What is a requirement of an FM200 (HFC-227) installation?

Options:

A.

It is a high-pressure gas; therefore nozzles must be mounted with two brackets.

B.

Drainage system under the raised floor.

C.

Install the gas containers (tanks) close to the data centre.

D.

Install pre-action sprinklers in the same room as the FM200.

Questions # 30:

What is a requirement for both CCTV cameras and recording equipment?

Options:

A.

They must be of the same brand.

B.

Both must be placed inside the Computer room.

C.

Both must be connected to a UPS.

D.

CCTV cameras can only be used to cover the outside of the building, where as the recording equipment needs to be located in a secure area.

Viewing page 3 out of 3 pages