Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Pass the Hitachi Vantara Qualified Professional HQT-4180 Questions and answers with ValidTests

Exam HQT-4180 All Questions
Exam HQT-4180 Premium Access

View all detail and faqs for the HQT-4180 exam

Viewing page 1 out of 1 pages
Viewing questions 1-10 out of questions
Questions # 1:

What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?

Options:

A.

1 TB

B.

2.99 TB

C.

65 TB

D.

128 TB

Expert Solution
Questions # 2:

You need to replace a broken disk drive on a VSP G700.

What are two prerequisites? (Choose two.)

Options:

A.

You must use the Replace button in the Maintenance Utility before removing the drive.

B.

You must wear a wrist strap for ESD protection.

C.

The red LED on the drive must be lit.

D.

The Drive Box where the drive is located must be powered down.

Expert Solution
Questions # 3:

A customer has a VSP G370 with the encryption license key installed. They now want to have all the DP-Volumes of a certain pool located on encrypted RAID Groups.

What are two requirements? (Choose two.)

Options:

A.

The controller board must support encryption.

B.

The RAID level of RAID Groups in the pool must be RAID 6.

C.

At least 20 GB of Shared Memory must be installed.

D.

The RAID Groups in the pool must be formatted with encryption enabled.

Expert Solution
Questions # 4:

Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.

What should you do next?

Options:

A.

Enable Port Security.

B.

Enable Host Group security.

C.

Create a Host Group.

D.

Scan for all WWNs.

Expert Solution
Questions # 5:

Which three RAID configurations are supported by VSP Midrange systems? (Choose three.)

Options:

A.

2D + 2D

B.

4D + 1P

C.

7D + 1P

D.

8D + 1P

E.

10D + 2P

Expert Solution
Questions # 6:

One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.

What are two requirements to separate the I/Os of the servers? (Choose two.)

Options:

A.

Both servers must be registered in two different Host Groups.

B.

Port security must be enabled on both ports.

C.

The Universal Volume Manager license must be installed.

D.

Two cache partitions must be created on the VSP for the servers.

Expert Solution
Questions # 7:

What are two consequences when a “New Installation” procedure is performed on a VSP Midrange system? (Choose two.)

Options:

A.

The SVP drive is formatted.

B.

The MPC software is updated.

C.

All the data on RAID groups is lost.

D.

The license keys are deleted.

Expert Solution
Questions # 8:

A drive in a 3D + 1P RAID group fails in a VSP G700 and there is no spare drive available.

Which two actions are automatically performed by the system? (Choose two.)

Options:

A.

An alert is generated.

B.

Dynamic Sparing is started.

C.

The Correction Copy process starts.

D.

The RAID group is placed in Correction Access.

Expert Solution
Questions # 9:

A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.

What needs to be performed next?

Options:

A.

Parity groups must be deleted.

B.

The RAID level must be changed in Storage Navigator.

C.

The RAID level in the SVP Maintenance window must be changed.

D.

The RAID 5 group must be put into DRU mode in Storage Navigator.

Expert Solution
Questions # 10:

Which tool do you use to install license keys on a VSP G370 system?

Options:

A.

HSA Embedded

B.

MPC Software

C.

Storage Navigator

D.

Maintenance Utility

Expert Solution
Viewing page 1 out of 1 pages
Viewing questions 1-10 out of questions