A customer needs to verify inbound packet statistics for interface Ten-GigabitEthernet 1/0/10 on an HPE FlexFabric 5900 series switch used by an iSCSI storage array.
Which command can be used in the CLI to perform this operation?
A customer needs a single, dual-processor server for an Enterprise Resource Planning solution for a single office. The customer application uses a mix of HDDs and SSDs and up to 3TB of RAM.
Which HPE Solution should you propose?
What does StoreOnce use to allow independent software vendors (ISV) to be aware of the HPE StoreOnce Backup system and its capabilities without emulation?
A customer needs an HPE Nimble storage solution with 100TB capacity. They want to be able to add more disk capacity if needed
Which HPE tool can help you validate the proposed storage solution and that it is supported by HPE?
A customer needs a virtual desktop infrastructure environment to quickly deploy new desktop images to more than 70 onsite contractors. They plan to use HPE ProLiant DL360 Gen10 servers running VMware ESXi connected to a shared storage device. The customer requires deduplication because they are concerned about the required storage capacity for the full clone images.
Which storage device would best address their concerns?
What is a feature of the MSA 1050 that will help your Storage Customer better utilize storage resources?
Match the customer requirement to the appropriate HPE storage solution.

A customer needs a server memory subsystem that meets the following requirements:
approaches the speed of traditional DRAM
ensures high capacity, high performance, and ongoing data safety in case of a power failure
Which HPE memory feature meets the customer needs?
A customer has a VMware environment with HPE ProLiant servers and Nimble storage. They have been using a Windows VM to provide file services for their employees.
The customer is experiencing performance issues with the solution due to memory constraints on the virtual environment.
What could be added to the existing environment that will provide dedicated file services with better performance that would still utilize the existing storage and backup solutions?
A solution integrator is installing new data center components including an HPE G2 Advanced Rack with two Standard Series G2 PDUs A customer observing the installation process questions whether there will be sufficient power for additional equipment that may be added in the future.
How should the solution integrator respond?