Summer Certification Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: validbest

Pass the ISTQB Software Testing & Quality CT-PT Questions and answers with ValidTests

Exam CT-PT All Questions
Exam CT-PT Premium Access

View all detail and faqs for the CT-PT exam

Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions
Questions # 11:

What is typically the result of oversaturation of system resources during performance testing?

Options:

A.

Response time will gradually improve over a period of time.

B.

Response time will be slow under significant load levels.

C.

Error logging will decrease.

D.

The size of the database will gradually decrease.

Expert Solution
Questions # 12:

You are managing a project that is testing a system that manages a newly redesigned jet engine for heavy aircraft. Given the fact that this engine is specifically engineered to reduce noise, it is important that the software maintains enough thrust for lift for a period of 5 minutes without exceeding 87.5dB. The software must achieve this independent of other internal systems such as fuel or navigation management.

Given the risk for the ability of the aircraft to meet the noise abatement regulations while still being able to fly, when is the optimum time in the software lifecycle to apply the performance testing?

Options:

A.

Preferably during each phase in the lifecycle

B.

Preferably at the end of system testing

C.

Preferably during system integration testing

D.

Preferably at the end of unit testing

Expert Solution
Viewing page 2 out of 2 pages
Viewing questions 11-20 out of questions