Questions # 31:

You need to set up the state control for sales of motorcycles.

Which two actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.

B.

Create an inclusive restricted product list for United States and add the motorcycle part to the list.

C.

Create an exclusive restricted product list for California and add the motorcycle part to the list.

D.

Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.

Questions # 32:

You need to resolve the shop supervisor’s issue.

Which options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Question # 32

Options:

Questions # 33:

You need to meet the requirements for User2.

What should you configure?

Options:

A.

Process over/under transactions.

B.

Create a transfer journal.

C.

Cancel the product receipt.

D.

Correct the product receipt.

E.

Create a movement journal.

Questions # 34:

You need to meet the substitution requirements for User4 and User5.

What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Question # 34

Options:

Questions # 35:

You need to meet the needs for the large teakwood furniture order.

What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Question # 35

Options:

Questions # 36:

You must ensure that the firepit product is available for sale. How should the product be released?

Options:

A.

Release the engineering product version and then assign the route.

B.

Connect the BOM to an engineering product version before release.

C.

Connect a route to an engineering version before release.

D.

Release the engineering product version and then assign BOM.

Questions # 37:

You need to calculate estimated consumption of ingredients for liquid cleaning solution.

What is the consumption? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Question # 37

Options:

Questions # 38:

You need to enable the features and configuration keys for the firepits.

Which two features should you enable? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point

Options:

A.

Engineering attributes

B.

Change management for process manufacturing

C.

Engineering product variants

D.

Engineering change management

E.

Production floor execution management

Questions # 39:

You need to configure production operations for the pine and orange scent solutions.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.

B.

Use a purchase agreement as a service agreement.

C.

Allocate subcontracted work in its own cost breakdown block.

D.

Configure a costing resource and requirement to point to a Vendor type resource.

E.

Configure the BOM line to be of type Vendor and associate the corresponding vendor account.

Questions # 40:

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

Options:

A.

Run inventory close for the BOM items for the limited-edition bicycle.

B.

Create the production order for the limited-edition bicycle and click estimate.

C.

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.

Run the pricing simulator for the limited-edition bicycle for a quantity of one.