Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: validbest

Pass the API ICP Programs API-936 Questions and answers with ValidTests

Exam API-936 All Questions
Exam API-936 Premium Access

View all detail and faqs for the API-936 exam

Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions
Questions # 21:

The installation contractor is required to secure an advance agreement that concerns all the installation details from the:

Options:

A.

Engineering company.

B.

Inspector.

C.

Owner.

D.

Manufacturer.

Expert Solution
Questions # 22:

How many specimens per sample are required for testing by ASTM C-704?

Options:

A.

One

B.

Two

C.

Three

D.

Four

Expert Solution
Questions # 23:

Which of the following is false per the requirements of API Standard 936?

Options:

A.

Cold crush strength is determined using two 4-1/2 in. (144 mm) × 4-1/2 in. (114 mm) × 4-1/2 in. (114 mm) cubes.

B.

Density shall be determined using cubes or erosion plates and linear change bars.

C.

Abrasion resistance is determined using two 4-1/2 in. (114 mm) × 4-1/2 in. (144 mm) × 1 in. (25 mm) specimens.

D.

Permanent linear change is determined with one 2 in. (50 mm) × 2 in. (50 mm) × 9 in. (230 mm) specimen.

Expert Solution
Questions # 24:

When installing refractory castables in hot weather conditions, which of the following is acceptable? (This may have more than one correct answer; please select all that apply.)

Options:

A.

Air conditioning of ambient air

B.

Decreasing mixing time

C.

Shading of equipment and mix area

D.

Spraying water on equipment

Expert Solution
Questions # 25:

The vessel in which the cracking reaction occurs or is completed, and in which the product gases are separated from coke and/or catalyst particulate, is the:

Options:

A.

stripper.

B.

reactor.

C.

regenerator.

D.

stand pipe.

Expert Solution
Viewing page 3 out of 3 pages
Viewing questions 21-30 out of questions