Weekend Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: simple70

Pass the EMC Storage Administrator D-PSC-MN-01 Questions and answers with ValidTests

Exam D-PSC-MN-01 All Questions
Exam D-PSC-MN-01 Premium Access

View all detail and faqs for the D-PSC-MN-01 exam

Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions
Questions # 1:

A platform engineer is at a customer site to replace a failed Dell EMC PowerScale Gen 6 node. After removing the compute module, they observe lit LEDs inside the removed node.

What is the recommended response?

Options:

A.

This is not normal; they need to shut down the partner node.

B.

There is an internal electrical fault; they should call support.

C.

The node is not yet completely shut down; they should wait.

D.

This is normal; they should continue with the procedure.

Expert Solution
Questions # 2:

What is done with the components when a Gen6 single node is replaced?

Options:

A.

Transferred to the new node

B.

Returned to Dell

C.

Sent to WWFA

Expert Solution
Questions # 3:

A platform engineer does not have a Flash drive available.

How can they reimage a Dell PowerScale node?

Options:

A.

Copy the OneFS install file to the node and run the isi_reimage command.

B.

Copy the OneFS install file onto CD and install from CD.

C.

Use a serial connection to run the installation from a laptop.

D.

Copy the OneFS install file to the node and run the isi diskutil command.

Expert Solution
Questions # 4:

What type of drive should a customer use to ensure that their data is encrypted?

Options:

A.

NVMe

B.

SSD

C.

SED

D.

Hard drive

Expert Solution
Questions # 5:

Which two backend switches support 100 GbE?

Options:

A.

DCS-7308

B.

S5232-ON

C.

29264-ON

D.

D4040

Expert Solution
Questions # 6:

Which resource provides up-to-date instructions to service a Dell EMC PowerScale system?

Options:

A.

Dell Quick Reference Guide

B.

Dell Enterprise Configuration Services

C.

Dell SolVe Online

D.

Dell iDRAC Service Module

Expert Solution
Questions # 7:

Which three F200 components can a customer replace?

Options:

A.

System Battery

B.

Network Interface Card

C.

CPU module

D.

DIMM

E.

NVDIMM Battery

Expert Solution
Questions # 8:

A platform engineer must install several Dell PowerScale clusters.

Which rack should they use for the A3000 nodes?

Options:

A.

Titan-HD

B.

Titan-D

C.

Titan-P

Expert Solution
Questions # 9:

Which are configured during the Configuration Wizard process?

Options:

A.

Contact information Secure Remote Services

B.

SmartConnect LDAP

C.

Date and time Secure Remote Services

D.

Date and time Encoding setting

Expert Solution
Questions # 10:

What is the rack size of an F600 node?

Options:

A.

3U

B.

2U

C.

1U

D.

4U

Expert Solution
Viewing page 1 out of 3 pages
Viewing questions 1-10 out of questions