View all detail and faqs for the CTFL-Foundation exam
What factors should be considered to determine whether enough testing has been performed?
(i)The exit criteria.
(ii)The budget.
(iii)How big the test team is.
(iv)The product's risk profile.
(v)How good the testing tools are.
(vi)Sufficient details of the system status to allow decisions
Typically, exit criteria may consist of:
Which of the following are 'Exit Criteria?'
A test case starts at S1 and triggers 4 events in sequence: E1, E4, E5, E7. What will be the finishing state and the output(s) from the test case? [K3]
Refer to the exhibit

The four test levels defined for a common V-model testing approach are:
The Cambrian Pullman Express has special ticketing requirements represented by the partial decision table below.
Refer to the exhibit

Carol has a student railcard and is travelling on a Flexible Standard Class ticket. James has a senior railcard and is travelling on a super saver ticket. Which of the options represents the correct actions for these two test cases? [K3]
Which of the following is a consideration when deploying test execution tools? [K1]
Which of the following processes ensures that all items of testware are identified, version controlled, tracked for changes, so that traceability can be maintained throughout the test process?
The flow graph below shows the logic of a program for which 100% statement coverage and 100% decision coverage is required on exit from component testing. [K4]
The following test cases have been run:
Test Case 1 covering path P,Q,R,U
Test Case 2 covering path P,Q,S,V
Test Case 3 covering path P,Q,S,W,X
Test case 4 covering path P,Q,S,W,Y
Refer to the exhibit

What is the main reason for using a pilot project to introduce a testing tool into an organization? [K1]