A customer wants to ensure that the Data Protection configuration using Protection Domains is fully functional.
The consultant has configured a protection domain for newly-created VMs with static IP addresses on multiple VLANs. The network administrator confirmed that the correct subnets exist at both physical sites.
After performing a failover operation, the virtual machines are turned back on but have no network access.
Which statement describes this issue?
In a 20-node ESXi deployment, the customer needs additional resiliency to survive the loss of two nodes concurrently.
Which configuration should the consultant use to ensure that the appropriate resources are available?
An administrator needs to evaluate if the existing configuration of Protection Domains meets the specified corporate recovery policy for SQL Data. The corporate policy requires that all SQL Servers be recoverable at the DR site within 30 minutes, and must result in a maximum of 60 minutes of data loss. SQL data must be required.
The protection domain is configured as follows:
• Application consistent snapshots are enabled
• The SQL server VMs are assigned to the Protection Domain as their own Consistency Group
• The Protection Domain schedule is configured as snapshots taken every 90 minutes from 7 am until 8 pm
What must be changed to meet the required policy?
An administrator is monitoring the Nutanix v5.15-based AOS cluster performance logs and notices that a SQL server VM is greatly exceeding its intended maximum IOPS. The administrator has confirmed that a QoS policy was previously created for the group of VMs this server is a member of.
What are two reasons that this VM would exceed its maximum configured IOPS from the QoS Policy? (Choose two.)
A customer already has a Prism Central (PC) instance deployed in their environment and expects the consultant to unregister the old cluster before registering the new cluster
What steps should the consultant take to safely and successfully unregister the customer's former cluster from PC?
During the Foundation imaging process, nodes are successfully imaged, but the cluster creation fails.
Which log should the consultant review to determine the cause?
A customer has an ESXi cluster with two 10GbE NICs on each node and the following requirements.
◦Solution must follow Nutanix Best Practices
◦Network configuration should be redundant
◦A vSphere Distributed Switch will be utilized
Which load balancing configuration should be used?
Before deploying a new 3-node cluster, a consultant wants to know which VLAN ID to use during Foundation.
Where can the consultant find this information?
A new Nutanix customer suspects that network traffic is going over the 1G interfaces instead of the 10G interfaces.
How should a consultant confirm that the traffic is only traversing the 10G interfaces?
After installation, network ports are properly configured with the default active-backup bonding.
One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.
What should the consultant enable to resolve this issue?