Questions # 21:

The measured units used for Mechanical Ultrasound are:

Options:

A.

VAC

B.

KHz

C.

MHz

D.

Hz

Questions # 22:

Which of the following is not part of a well-developed training strategy?

Options:

A.

Definition of skill requirements

B.

Performance reviews

C.

Gap closure plan

D.

Assessment of current skills

Questions # 23:

Why is change management essential to the implementation of a Maintenance and Reliability Program?

Options:

A.

To create an appropriate paradigm shift where required

B.

To explain past mistakes and lost profits

C.

To overcome the "program-of-the-month" syndrome

D.

Because management systems are slow to react

Questions # 24:

Which of the following statements best represents the primary objective of an inventory controlsystem for maintenance materials?

Options:

A.

Provide for accounting and managing of inventory.

B.

Balance the cost of inventory with the risk of running out of stock.

C.

Provide maintenance items when required and at the right price.

D.

Reduce and sustain the maintenance costs of an organization.

Questions # 25:

Your plant (facility) is in a sold-out position You just told a visiting senior manager from the head office that the reason you place so much emphasis and spend so much money on maintenance planning is that it not only sales money, but it makes money for the business. He asks: How can it make money for the business? Your most comprehensive answer is:

Options:

A.

It improves quality yield through reduced process disruptions.

B.

It ensures the mechanics are productive all day long.

C.

It reduces finished product inventory through increasing reliability.

D.

It enables effective maintenance thereby increasing production capability.

Questions # 26:

You are new to the job of maintenance manager. As you start reviewing the work done by your five planners you find that, on average, they are dividing their time as follows:

5% Interviewing area personnel to scope out jobs

2% Creating pipe sketches and other small drawings

9% Ordering materials through the Computerized Maintenance Management System

(CMMS)

5% Creating work order estimates

15% Researching what spare parts are needed and where to find them

25% Expediting materials that have not come in yet

5% Creating material kits for future jobs and maintaining the kitting area

1% Creating formal job steps in the work order record in the CMMS

10% Checking on field progress of the larger jobs

15% Talking with mechanics to explain the details of work they are to perform

8% Closing work orders and other data clean up tasks in the CMMS

In which two areas should you concentrate onto make the planners more productive?

Options:

A.

Eliminate the practice of job materials kitting or staging and purchase a different computerized maintenance and materials system

B.

Encourage the planners to create more detailed job instructions in the work order record and hire another designer draftsman

C.

Increase the planning horizon and improve the quality of bills of material in the computerized maintenance and materials system

D.

Improve their communication skills through training and train all planners on proper estimation methods

Questions # 27:

What is the relationship between leading indicator metrics and lagging indicator metrics in the field of Maintenance and Reliability?

Options:

A.

Lagging indicators are measures that reflect accomplishment of goals, while leading indicators are measures of what must be done to improve results.

B.

Leading indicators are measures thatreflect accomplishment of goalswhile lagging indicators are measures of what must be done to improve results.

C.

Leading indicators are low level measures that reflect accomplishment of goals, while lagging indicators are measures of what must be done to improve results.

D.

Leading indicators are used by management, while lagging indicators are used by personnel on the shop floor.

Questions # 28:

Which time interval must be considered to decide how frequently to perform a condition monitoring maintenance activity?

Options:

A.

The time interval remaining before a failure after the most recent preventive maintenance operation has been performed

B.

The time interval between the occurrence of a detectable potential failure and its decay into a functional failure

C.

The Mean Time Between Failures (MTBF) of the failure being detected, plus a time safety margin

D.

The MTBF of the failure being detected, minus a time safety margin

Questions # 29:

The planning function should focus primarily on:

Options:

A.

Accurate estimates.

B.

Material availability.

C.

Equipment records.

D.

Future work.

Questions # 30:

Preventive maintenance tasks should be grouped by?

Options:

A.

Parts required, task interval and lockout -tag out requirement

B.

Skill required, parts required and equipmentavailability

C.

Skill required, task and interval

D.

Skill required, task interval and lockout -tag out requirement