Questions # 91:

When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the Construction General Permit must contain which of the following?

Options:

A.

Waste Management Plan

B.

Building orientation on the site

C.

Installation plan for perimeter control

D.

Minimum standards for equipment exhaust

Expert Solution
Questions # 92:

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if

Options:

A.

the Phase II ESA uncovers suspected contamination

B.

contamination was identified by the certified facility

C.

the certified facility's Phase I ESA is older than 180 days

D.

the local equivalent standard is more stringent than ASTM E1527-05

Expert Solution
Questions # 93:

A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

Options:

A.

Protects greenfields and farmland

B.

Preserves habitat and natural resources

C.

Reduces need for new utility infrastructure

D.

Reduces potential damage to an existing stream

Expert Solution
Questions # 94:

Which of the following Materials and Resources credits or prerequisites is reviewed under the design phase documentation submission?

Options:

A.

PBT Source Reduction - Lead, Cadmium, and Copper

B.

PBT Source Reduction - Mercury

C.

Building Product Disclosure and Optimization - Environmental Product Declarations

D.

Building Product Disclosure and Optimization - Sourcing of Raw Materials

Expert Solution
Questions # 95:

Which of the following documents detail the ideas, concepts, and criteria determined to be important to the success of a building?

Options:

A.

Design review log

B.

Basis of design

C.

Integrated project delivery

D.

Owner's project requirements

Expert Solution
Questions # 96:

For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

Options:

A.

Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony

B.

Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)

C.

Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium

D.

Plastic armrests, 30% of product by weight, with added antimicrobial treatment

Expert Solution
Questions # 97:

A project team develops a site plan for a school project with an athletic field and a playground with real grass. In order to qualify for the Water Efficiency Prerequisite, Outdoor Water Use Reduction, the landscape area calculations:

Options:

A.

Must include the athletic field and playground

B.

May include the playground but must exclude the athletic field

C.

Must include the playground but exclude the athletic field

D.

May include or exclude the athletic field and the playground

Expert Solution
Questions # 98:

A project team is providing additional ventilation under Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies. What credit could this adversely affect?

Options:

A.

Energy and Enhanced Commissioning

B.

Indoor Environmental Quality, Thermal Comfort

C.

Energy and Atmosphere, Optimize Energy Performance

D.

Indoor Environmental Quality, Interior Lighting

Expert Solution
Questions # 99:

A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume. Which one of the following LEED credits or prerequisites will be affected by these results?

Options:

A.

Sustainable Sites Credit, Rainwater Management

B.

Sustainable Sites Prerequisite, Environmental Site Assessment

C.

Location and Transportation Credit, Sensitive Land Protection

D.

Location and Transportation Credit, High-Priority Site

Expert Solution
Questions # 100:

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

The general contractor

B.

A LEED AP

C.

The project's mechanical engineer

D.

The owner or an owner's representative

Expert Solution