Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: validbest

Pass the VMware VCAP-CMA Design 3V0-32.23 Questions and answers with ValidTests

Exam 3V0-32.23 All Questions
Exam 3V0-32.23 Premium Access

View all detail and faqs for the 3V0-32.23 exam

Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions
Questions # 11:

A design for a Cloud Management solution includes a section that describes the association of VMware Aria Operations solution with a remote collector for the purpose of gathering performance and usage metrics.

Which area of the design would contain that section?

Options:

A.

Physical

B.

Requirements

C.

Logical

D.

Conceptual

Expert Solution
Questions # 12:

An architect is designing an Aria Automation for Secure Host for configuration management and Security operations with the following requirements:

The network has more than 500 nodes to be managed.

The number of nodes can scale up to 5000 as the network grows.

There is a need for load balancing.

What two aspects does the architect need to include when designing the solution? (Choose two.)

Options:

A.

Deploy Aria Automation for Secure Hostwith Aria Suite Lifecycle Manager

B.

Deploy Aria Automation for Secure Host with standard installation

C.

Prepare four nodes with different functions suchas RaaS, the Salt master, PostgreSQL and Redis

D.

Prepare two nodes with the RaaS function

E.

Prepare three nodes with a Databases function

Expert Solution
Questions # 13:

What level of design will contain an automation platform, an operational monitoring platform, and a desktop platform?

Options:

A.

Logical Design

B.

Detailed Design

C.

Physical Design

D.

Conceptual Model

Expert Solution
Questions # 14:

An architect is designing the VMware Aria Operations component of a Cloud Management solution. The following information has been provided by the customer:

The solution must support the monitoring of virtual machines across three physical sites.

The latency between each physical site is less than 10 ms.

The solution must be resilient to a site failure.

The solution should be resilient to a failure within a site.

Which two design decisions should the architect document to meet the requirements? (Choose two.)

Options:

A.

The VMware Aria Operations cluster should be deployed across all sites usinq vSphere Hiqh Availability

B.

The VMware Aria Operations cluster should be deployed across all sites using Continuous Availability

C.

The VMware Aria Operations cluster should be deployed in each site using High Availability

D.

The VMware Aria Operations cluster should be deployed across all clusters usinq vSphere Fault Tolerance

E.

All VMware Aria Operations components should reside on clusters confiqured for vSphere Fault Tolerance

Expert Solution
Questions # 15:

An architect is designing a VMware Aria Cloud Management solution. During the requirements gathering workshop with the customer, the future Service Owner made the following comment:

The Maximum Tolerable Downtime for the Cloud Management solution is one hour.

When creating the design documentation, which design quality should be used to classify the requirements?

Options:

A.

Availability

B.

Recoverability

C.

Performance

D.

Manageability

Expert Solution
Questions # 16:

A customer has an existing deployment of VMware Aria Operations configured with VMware Aria Operations Standard licensing. The customer has decided to buy additional VMware Aria Operations Enterprise licenses to support native public cloud management.

Which options will allow the customer to consume these new Enterprise licenses? (Choose two.)

Options:

A.

Use license groups for Enterprise and Standard licenses within the existing cluster

B.

Purchase the Enterprise Licenses as OSI instead of CPU

C.

Deploy a second VMware Aria Operations cluster

D.

Upgrade all of the Standard licenses to Enterprise

E.

Replace all Standard licenses with vRealize Business for Cloud licenses

Expert Solution
Questions # 17:

An architect is responsible for designing a Cloud Management solution for a customer.

Which two constraints should the architect detail in the design for this customer? (Choose two.)

Options:

A.

All management tools must be installed within the Management Zone.

B.

The customer has invested in a third-party configuration management tool and this investment must be protected.

C.

The solution must support the existing VMware Software Defined Data Center, which has recently beenupgraded to VMware vSphere7.

D.

The solution should enable business users to deploy workloads to both the private and public cloud environments.

E.

The solution should enable developers to deploy workloads using REST API.

Expert Solution
Questions # 18:

Which recommendation should an architect make when designing a highly available VMware Aria Operations cluster?

Options:

A.

Deploy analytics nodes with the same disk size on storage of the same type.

B.

Set Storage DRS to Fully Automated for all VMware Aria Operations Manager analytics nodes.

C.

If the sizing guideline provides several configurations for the same number of objects, use the configuration which has the greatest number of nodes.

D.

Depending on the size and performance requirements for analytics nodes, apply Storage DRS Affinity rules to ensure that nodes are on same datastores.

Expert Solution
Questions # 19:

Which two design decisions would an architect document as part of the physical design? (Choose two.)

Options:

A.

VMware Aria Operations Remote Collectors will be deployed in each location.

B.

The solution will use VMware Aria Operations Continuous Availability.

C.

Storage replication for VMware Aria Operations Manager will not be enabled.

D.

The VMware Aria Operations analytics cluster will be comprised of three Large nodes.

E.

vSpherereservation will be used to guarantee a 1:1 vCPU to physical core ratio for data nodes

Expert Solution
Questions # 20:

A customer is looking at embarking on their cloud journey and automating their infrastructure deployment using the VMware Cloud Management solution.

The CIO’s goal is to optimize expenditures by making sure that the resources are right-sized, reclaimed, and retired.

Which VMware Cloud Management component will help the customer achieve this?

Options:

A.

Aria Operations for Applications

B.

Aria Automation

C.

Aria Operations for Logs

D.

Aria Operations

Expert Solution
Viewing page 2 out of 3 pages
Viewing questions 11-20 out of questions