Questions # 11:

Consider the following list of activities (I to V):

I. Test design

II. Test planning

III. Review test basis

IV. Be a facilitator of a peer review

V. Test monitoring and control

Which ONE of the following options identifies the activities that the test management role is MAINLY focused on?

Options:

A.

Activities III, IV, and V

B.

Activities II and V

C.

Activities I and V

D.

Activities I, III, and IV

Expert Solution
Questions # 12:

The following rules determine the annual bonus to be paid to a salesman of a company based on the total annual amount of the sales made (referred to as TAS).

If the TAS is between 50k€ and 80k€, the bonus is 10%. If the TAS exceeds 80k€ by a value not greater than 40k€, the bonus is 15%. Finally, if the TAS

exceeds the maximum threshold which entitles to a 15% bonus, the bonus is 22%.

Consider applying equivalence partitioning to the TAS (Note: 1k€ = 1000 euros).

Which one of the following answers contain only test cases that belong to the same equivalence partition?

Options:

A.

TC1 = 81 k€; TC2= 97k€; TC3=111k€; TC4=118k€

B.

TC1 = 40k€; TC2= 46k€; TC3=51k€; TC4=53k€

C.

TC1 = 79k€; TC2= 80k€; TC3=81k€; TC4=82k€

D.

TC1 = 90k€; TC2= 110k€; TC3=125k€: TC4=140k€

Expert Solution
Questions # 13:

You are an experienced tester on a project with incomplete requirements and under pressure to deploy.

What type of testing should you do?

Options:

A.

Decision-based testing.

B.

Checklist-based testing.

C.

Error guessing.

D.

Exploratory testing.

Expert Solution
Questions # 14:

Which ONE of the following options CORRECTLY describes one of the seven principles of the testing process?

Options:

A.

The objective of testing is to implement exhaustive testing and execute as many test cases as possible.

B.

Exhaustive testing can only be carried out using behavior-based techniques.

C.

It is impossible to test all possible combinations of inputs and preconditions of a system.

D.

Automated testing enables exhaustive testing.

Expert Solution
Questions # 15:

Which type of software development product can undergo static testing?

Options:

A.

Any software development product can undergo static testing, including requirements specifications, design specifications and code.

B.

Static tests should be performed on the installation and user guide documents as these documents are used by the end user.

C.

Static testing is done only on the code as part of the "code review" sessions Other documents are reviewed, but not by static testing.

D.

Static testing is done only on the requirements You need to execute the software in order to find defects in the code.

Expert Solution
Questions # 16:

Which of the following statements about the value of maintaining traceability between the test basis and test work products is not true?

Options:

A.

Traceability can be useful for assessing the impact of a change to a test basis item on the corresponding tests

B.

Traceability can be useful for determining how many test basis items are covered by the corresponding tests

C.

Traceability can be useful for determining the most suitable test techniques to be used in a testing project

D.

Traceability can be useful to support the needs required by the auditing of testing

Expert Solution
Questions # 17:

A new web app aims at offering a rich user experience. As a functional tester, you have run some functional tests to verify that, before releasing the app, such app works correctly on several mobile devices, all of which are listed as supported devices within the requirements specification. These tests were performed on stable and isolated test environments where you were the only user interacting with the application. All tests passed, but in some of those tests you observed the following issue: on some mobile devices only, the response time for two web pages containing images was extremely slow.

Based only on the given information, which of the following recommendation would you follow?

Options:

A.

You should open a defect report providing detailed information on which devices and by running which tests you observed the issue

B.

The issue is related to performance efficiency, not functionality. Thus, as a functional tester, you should not open any defect report as all the functional tests passed

C.

You should not open any defect report as the problem is most likely due to poor hardware equipment on the devices where you observed the issue

D.

You should not open any defect report and inform the test manager that the devices on which you observed the issue should no longer be supported so that they will be removed from the requirements specification

Expert Solution
Questions # 18:

Your organization's test strategy states that it is desirable to usemore than one method for estimating test effort. You are responsible for estimating test effort for the next project. Based on historical data, thedevelopment-to-test effort ratiois5:3.

The initial estimate for thedevelopment effort is 450 person-days.

Which ONE of the following options corresponds to the estimatedtest effortusing the ratio-based method?

Options:

A.

750 person-days

B.

180 person-days

C.

720 person-days

D.

270 person-days

Expert Solution
Questions # 19:

You are performing the role of tester on an Agile project. Which of the following tasks would be your responsibility?

i. Understanding, implementing, and updating the test strategy.

II. Ensuring the proper use of testing tools.

Hi. Coaching other team members in the relevant aspects of testing.

iv. Actively collaborating with developers and business stakeholders to clarify requirements, especially in terms of testability, consistency, and completeness.

v. Participating proactively in team retrospective meeting, suggesting and implementing improvements.

Select the correct answer:

Options:

A.

i, iv and v

B.

i, ii and iii

C.

i, iii and v

D.

iii. iv and v

Expert Solution
Questions # 20:

The four test levels used in ISTQB syllabus are:

1. Component (unit) testing

2. Integration testing

3. System testing

4. Acceptance testing

An organization wants to do away with integration testing but otherwise follow V-model. Which of the following statements is correct?

Options:

A.

It is allowed as organizations can decide on men test levels to do depending on the context of the system under test

B.

It is allowed because integration testing is not an important test level arc! can be dispensed with.

C.

It is not allowed because integration testing is a very important test level and ignoring i: means definite poor product quality

D.

It is not allowed as organizations can't change the test levels as these are chosen on the basis of the SDLC (software development life cycle) model