Questions # 11:

Innovation credits for exemplary performance can be awarded for

Options:

A.

achieving one pilot credit

B.

achieving double the credit requirements

C.

demonstrating significant environmental benefits

D.

demonstrating a qualitative improvement in environmental performance

Expert Solution
Questions # 12:

Minimizing light trespass is a key component of which of the following credits?

Options:

A.

Energy and Atmosphere Credit, Optimize Energy Performance

B.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

C.

Sustainable Sites Credit, Light Pollution Reduction

D.

Indoor Environmental Quality Credit, Interior Lighting

Expert Solution
Questions # 13:

While working on a 12,000 ft² (1,114.8 m²) medical building, a LEED AP asks the flooring manufacturer to submit the Environmental Product Declaration (EPD) for the flooring specified. The manufacturer doesn't have an EPD for their products, but all products meet ISO 14040/44 for Life Cycle Assessment (LCA). They ask if it would be acceptable to send the ISO 14040/44 LCA information in lieu of an EPD. How do you respond?

Options:

A.

Contact another manufacturer that has a comparable product with an EPD

B.

Exclude the flooring from the LEED credit as non-compliant

C.

Request recycled content information, as the ISO 14040/44 LCA is not sufficient for compliance

D.

Use the ISO 14040/44 LCA information just like an EPD to complete the documentation for the LEED credit

Expert Solution
Questions # 14:

Which of the following is required in determining the baseline for Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Duration of use

B.

Building floor area

C.

Make and model of fixtures

D.

Proposed design fixture flow rates

Expert Solution
Questions # 15:

Which of the following buildings meets the Minimum Program Requirements for LEED certification?

Options:

A.

A 1,500 ft2 (139 m2) Tourism Center located on a previously undeveloped one-acre site

B.

A 20,000 ft2 (1 859 m2) Transit Parking Garage located on a previously developed five-acre site

C.

A 2,500 ft2 (232 m2) mobile Health Clinic located on a previously constructed above-water dock

D.

A 5,000 ft2 (465 m2) Science Education center on an above-water pier that is being built specifically for the Education center

Expert Solution
Questions # 16:

During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highly reflective roof. Which change should the LEED AP recommend to best address these concerns without negatively impacting other LEED credits?

Options:

A.

Change the design to incorporate rooftop solar panels

B.

Change the roofing material to a dark material to eliminate the issue

C.

Change the design to reduce the amount of roofing area

D.

Change the design to include a vegetative roofing system

Expert Solution
Questions # 17:

What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location

and Transportation Credit, Access to Quality Transit?

Options:

A.

Two points

B.

Three points

C.

Four points

D.

Five points

Expert Solution
Questions # 18:

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

Options:

A.

Split Review

B.

Appeal Review

C.

Expedited Review

D.

Credit Interpretation Ruling

Expert Solution
Questions # 19:

Which of the following requires standard appliances for indoor water reduction?

Options:

A.

CEE Tier 3A

B.

GreenSeal

C.

ASHRAE Standard 62.1-2010

D.

ISO 14044-2006

Expert Solution
Questions # 20:

An office project has the following items in its break room kitchen: a kitchen sink, a residential-style dishwasher, and a coffee machine. How would these items be addressed in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

The kitchen sink is included in fixture calculations, the dishwasher and coffee machine must be ENERGY STAR® or performance equivalent

B.

The kitchen sink is included in fixture calculations, the dishwasher must be ENERGY STAR® or performance equivalent, and the coffee machine is not included in the prerequisite

C.

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine is not included in the prerequisite

D.

The kitchen sink and dishwasher must be WaterSense labeled and the coffee machine should be included in fixture calculations