Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: validbest

Pass the USGBC Leadership in Energy and Environmental Design (LEED) LEED-AP-BD+C Questions and answers with ValidTests

Exam LEED-AP-BD+C All Questions
Exam LEED-AP-BD+C Premium Access

View all detail and faqs for the LEED-AP-BD+C exam

Viewing page 3 out of 11 pages
Viewing questions 21-30 out of questions
Questions # 21:

When measuring sound pressure levels in a classroom to determine compliance with the HVAC background noise requirements of LEED Building Design and Construction: Schools, Indoor Environmental Quality Prerequisite, Minimum Acoustic Performance, what testing conditions are appropriate for the classroom?

Options:

A.

Furnished, teacher speaking, HVAC operating at maximum flow rates

B.

Unfurnished, teacher speaking, HVAC operating at typical level

C.

Furnished, no occupants, HVAC operating at typical level

D.

Unfurnished, no occupants, HVAC operating at maximum flow rates

Expert Solution
Questions # 22:

A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

Options:

A.

12,500 ft2 (1 160 m2)

B.

15,000 ft2 (1 400 m2)

C.

25,000 ft2 (2 300 m2)

D.

35,000 ft2 (3 250 m2)

Expert Solution
Questions # 23:

A new school with a 20 car parking lot has set aside four preferred parking spaces for green vehicles. What else must the project team provide to achieve Location and Transportation Credit, Green Vehicles?

Options:

A.

Nothing; the project team has met the credit requirements

B.

Provide secure bike racks for 5% of the building occupants

C.

Provide an additional parking space for a low-emitting and fuel-efficient vehicle

D.

Provide qualifying electrical vehicle supply equipment in 2% of all parking spaces

Expert Solution
Questions # 24:

A project design team for an elementary school project is attempting to achieve Innovation Credit, Innovation, Option 1. Innovation. Which of the following strategies would qualify?

Options:

A.

Pilot Credit from LEED Pilot Credit Library

B.

Exemplary Performance in Energy and Atmosphere Credit, Optimize Energy Performance

C.

Create educational kiosks and posters around the school with picture of building systems' sustainable features

D.

Implement a building as a learning lab curriculum that has been piloted in three other primary schools in the district

Expert Solution
Questions # 25:

An office is relocating to a new facility. Any furniture that is relocated to the new site can contribute as a reused material for Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials if it was purchased:

Options:

A.

At least two years prior to the date of project registration

B.

Within the past five years

C.

Within two years of the substantial completion of the project

D.

At least five years prior to the certification of the project

Expert Solution
Questions # 26:

Which of the following methods is the referenced standard for demonstrating compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.

ASHRAE 62.2 - 2007

B.

ASHRAE 90.1 - 2010

C.

ASHRAE 55 - 2010

D.

ASHRAE 62.1 - 2010

Expert Solution
Questions # 27:

In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?

Options:

A.

One-way streets

B.

Bike share

C.

Slow speed roadways

D.

Traffic lights

Expert Solution
Questions # 28:

Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?

Options:

A.

Basis of Design (BOD)

B.

Simple Box Energy Model Analysis

C.

System's manual

D.

Integrated Project Delivery report

Expert Solution
Questions # 29:

A facility manager cleaning highly reflective paving material is

Options:

A.

unnecessarily wasting water

B.

reducing the heat island effect

C.

increasing the heat island effect

D.

lowering the Solar Reflectance Index (SRI)

Expert Solution
Questions # 30:

Which of the following projects is eligible to pursue the Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

Options:

A.

50,000 ft2 (4 645 m2) office project

B.

80,000 ft2 (7 432 m2) hospital project

C.

110,000 ft2 (10 219 m2) school project

D.

140,000 ft2 (13 006 m2) retail project

Expert Solution
Viewing page 3 out of 11 pages
Viewing questions 21-30 out of questions