View all detail and faqs for the FlashArray-Implementation-Specialist exam
What is the rack unit height of a FlashArray//XL?
What hardware should the Implementation Engineer find in the upgrade kit in order to perform an //X to //XL NDU?
After performing a hardware upgrade from an //M20R2 to a //X20R3-EMEZZ, a customer wants to add a Direct Flash Modules data pack to replace the existing SAS Chassis Data Packs (2x 20TB DPs). What extra hardware is required?
In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?
A customer has a FlashArray X20R3 with 22/22 data packs in the chassis at 80% space usage and wishes to swap one of the data packs for a 45TB pack. What step needs to be taken to facilitate this consolidation?
Which Purity command can be used to validate I/O is balanced across initiators?
Which I/O card type is compatible across all FlashArray models?
What are the interface names for a 4-port FC card in slot 1 in an XR2/3 array?
Which default speed FC SFPs are shipped in FlashArray//XCR4 FC arrays?
What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?