View all detail and faqs for the FlashArray-Implementation-Specialist exam
What is the rack unit height of a FlashArray//XR2/3?
An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis.
What type of controller is required to complete the upgrade?
An Implementation Engineer arrives on site to complete a shelf evac. What action must take place before Pure Support can run the completion commands?
An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?
An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller.
How should the Implementation Engineer complete the installation?
What command should the Implementation Engineer run to configure a proxy?
An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?
Which FlashArray//XL DirectMemory Modules (DMMs) configuration condition is true?
During an intra-series upgrade from //XR3 to //XR4, which command should the Implementation Engineer run to verify host connectivity before removing the secondary controller?
During an NDU, when is the Implementation Engineer required to install additional NVRAM modules in slots 2 and 3?