Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: validbest

Pass the Pure Storage FAIS FlashArray-Implementation-Specialist Questions and answers with ValidTests

Exam FlashArray-Implementation-Specialist All Questions
Exam FlashArray-Implementation-Specialist Premium Access

View all detail and faqs for the FlashArray-Implementation-Specialist exam

Viewing page 8 out of 8 pages
Viewing questions 71-80 out of questions
Questions # 71:

What is the rack unit height of a FlashArray//XR2/3?

Options:

A.

3

B.

4

C.

5

Questions # 72:

An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis.

What type of controller is required to complete the upgrade?

Options:

A.

FLASHARRAY//X50 R4, SE

B.

FLASHARRAY//X50 R4, NS

C.

FLASHARRAY//X50 R4, Base

D.

FLASHARRAY//X50 R4, NVMe

Questions # 73:

An Implementation Engineer arrives on site to complete a shelf evac. What action must take place before Pure Support can run the completion commands?

Options:

A.

Enable Remote Assist (RA).

B.

Power off the shelf.

C.

Set maintenance tag.

Questions # 74:

An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?

Options:

A.

Install the four new DFMDs and run puredrive .

B.

Work With the account team to Ship DFMS instead Of the DFMDS.

C.

Install the four new DFMDs, run puredrive admit and have support set the tunable puretune --set ALLOW_DFMD_IN_DFM_WWG 1

Questions # 75:

An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller.

How should the Implementation Engineer complete the installation?

Options:

A.

Install a DFS card in PCIe slot 3 and use it to connect the second DirectFlash Shelf.

B.

Install a DFS card in PCIe slot 4 and use it to connect the second DirectFlash Shelf.

C.

Install a DFS card in PCIe slot 0 and use these ports for shelf connectivity.

D.

Daisy-chain the second shelf directly into the SAS ports of the first DirectFlash Shelf.

Questions # 76:

What command should the Implementation Engineer run to configure a proxy?

Options:

A.

purearray setattr --proxy https://yourproxyserver:1234

B.

puresetup proxy https://yourproxyserver:1234

C.

purearray configure --proxy url https://example.proxy.server

D.

purenetwork proxy set https://yourproxyserver:1234

Questions # 77:

An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?

Options:

A.

puredns list --ntpserver

B.

purenetwork list --ntpserver

C.

purearray list --ntpserver

Questions # 78:

Which FlashArray//XL DirectMemory Modules (DMMs) configuration condition is true?

Options:

A.

DMMs cannot be installed in a DirectFlash Shelf (DFS).

B.

DMMs are only compatible with //XL 170.

C.

DMMs use different drive slots to regular DirectFlash modules.

D.

DMMs are required for baseline array initialization.

Questions # 79:

During an intra-series upgrade from //XR3 to //XR4, which command should the Implementation Engineer run to verify host connectivity before removing the secondary controller?

Options:

A.

host_connectivity --hosts

B.

purehost list --host | less

C.

iobalance --sampletime 30

D.

purenetwork monitor --live

Questions # 80:

During an NDU, when is the Implementation Engineer required to install additional NVRAM modules in slots 2 and 3?

Options:

A.

Upgrading a FlashArray//X50R3 to a FlashArray//X70R4

B.

Upgrading a FlashArray//X50R3 to a FlashArray//X50R4

C.

Upgrading a FlashArray//X70R4 to a FlashArray//X90R4

D.

Upgrading a FlashArray//X10R3 to a FlashArray//X20R4

Viewing page 8 out of 8 pages
Viewing questions 71-80 out of questions