Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: validbest

Pass the Pure Storage FAIS FlashArray-Implementation-Specialist Questions and answers with ValidTests

Exam FlashArray-Implementation-Specialist All Questions
Exam FlashArray-Implementation-Specialist Premium Access

View all detail and faqs for the FlashArray-Implementation-Specialist exam

Viewing page 3 out of 8 pages
Viewing questions 21-30 out of questions
Questions # 21:

A customer has ordered several FlashArrays and wants to have ActiveCluster configured. What is the maximum quantity of arrays supported with ActiveCluster?

Options:

A.

2

B.

3

C.

4

Expert Solution
Questions # 22:

When should a FlashArray support case be opened?

Options:

A.

Once an issue arises

B.

Once install is completed

C.

Before starting install

Expert Solution
Questions # 23:

What is the rack unit height of a FlashArray//XL?

Options:

A.

4

B.

5

C.

6

Questions # 24:

Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?

Options:

A.

pureboot list

B.

cobalt_check.py

C.

purehw list

Questions # 25:

An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array. What is the required service depth clearance for the front and rear panels Of the FlashArray//XR4?

Options:

A.

Front panel: 216 mm (8.5 in.), Rear panel: 530 mm (20.9 in.)

B.

Front panel: 530 mm (20.9 in.), Rear panel: 216 mm (8.5 in.)

C.

Front panel: 530 mm (20.9 in.), Rear panel: 530 mm (20.9 in.)

Questions # 26:

During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer encounters a failure during the power supply check. Voltage readings are correct. What is a likely cause of this failure?

Options:

A.

There are more than 10 drives installed in the chassis.

B.

The power cables are NOT fully seated in the array.

C.

Purity does NOT recognize the power supplies installed in the array.

Questions # 27:

A customer has purchased a FlashArray//XL. What power cables are required in order to connect this array to rack PDUs?

Options:

A.

2 x C13/14

B.

4 x C13/14

C.

4 x C19/20

Questions # 28:

What command should the Implementation Engineer run to configure a proxy?

Options:

A.

puresetup proxy https://yourproxyserver:1234

B.

purearray setattr --proxy https://yourproxyserver:1234

C.

purearray configure --proxy urlhttps://example.proxy.server

Questions # 29:

An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?

Options:

A.

purewes controller disable --purity --verify-mode secondary --verify-array ARRAY_NAME ct0

B.

purewes controller disable --purity --verify-mode primary --verify-array ARRAY_NAME ct0

C.

purewes controller setattr --disable --verify-mode secondary --verify-array ARRAY_NAME ct0

Questions # 30:

A FlashArray//XR2/3 has an Ethernet mezzanine (EMEZZ), what are the interface names of the ports on the mezzanine?

Options:

A.

ETH6, ETH7, ETH8, and ETH9

B.

ETH8, ETH9, ETH10, and ETH11

C.

ETH10, ETH11, ETH12, and ETH13

Viewing page 3 out of 8 pages
Viewing questions 21-30 out of questions