View all detail and faqs for the FlashArray-Implementation-Specialist exam
A customer has ordered several FlashArrays and wants to have ActiveCluster configured. What is the maximum quantity of arrays supported with ActiveCluster?
When should a FlashArray support case be opened?
What is the rack unit height of a FlashArray//XL?
Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?
An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array. What is the required service depth clearance for the front and rear panels Of the FlashArray//XR4?
During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer encounters a failure during the power supply check. Voltage readings are correct. What is a likely cause of this failure?
A customer has purchased a FlashArray//XL. What power cables are required in order to connect this array to rack PDUs?
What command should the Implementation Engineer run to configure a proxy?
An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?
A FlashArray//XR2/3 has an Ethernet mezzanine (EMEZZ), what are the interface names of the ports on the mezzanine?