Pre-Summer Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: validbest

Pass the Pure Storage FAIS FlashArray-Implementation-Specialist Questions and answers with ValidTests

Exam FlashArray-Implementation-Specialist All Questions
Exam FlashArray-Implementation-Specialist Premium Access

View all detail and faqs for the FlashArray-Implementation-Specialist exam

Viewing page 5 out of 8 pages
Viewing questions 41-50 out of questions
Questions # 41:

Which NVRAM bays are always populated on the FlashArray//XR2/3?

Options:

A.

0-3

B.

0-2

C.

0-1

Questions # 42:

An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers. Which command should the Implementation Engineer run to list the NTP servers that have been configured?

Options:

A.

puredns list --ntpserver

B.

purenetwork list --ntpserver

C.

purearray list --ntpserver

Questions # 43:

Where can the NVRAM on a FlashArray//E be located?

Options:

A.

Distributed across DFMes

B.

Distributed across DFMDs

C.

Within the dedicated NVRAMS

Questions # 44:

An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?

Options:

A.

Primary

B.

Secondary

C.

Standby

Questions # 45:

Which PCIe slot must be used for a SAS HBA on R4B revision controllers?

Options:

A.

PCIe slot 0

B.

PCIe slot 1

C.

PCIe slot 4

Questions # 46:

An Implementation Engineer performs a controller upgrade. What command should the Implementation Engineer run to check I/O health?

Options:

A.

purehost monitor --balance

B.

purehost list --all

C.

pureport list --initiator

Questions # 47:

An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?

Options:

A.

0

B.

4

C.

6

Questions # 48:

An evacuation is already in progress when the Account Team informs the Implementation Engineer that the customer wants to include another data pack to the evacuation. How should the Implementation Engineer proceed With this request?

Options:

A.

Wait for the current evacuation to complete before starting a new one.

B.

Issue a new evacuation command and the FlashArray will add it to the current evacuation job.

C.

Cancel the current evacuation and start a new evacuation with the additional packs or shelves included.

Questions # 49:

An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full. The starting config is X50R2-20/10-22/0. The end config is X50R2-91/0. What steps should the Implementation Engineer follow to complete the work?

Options:

A.

Evac the chasses drives, install the new 91TB chassis data pack, and evac SH0.

B.

Move the 20TB chassis DP to SH0, install the new 91TB chassis DP, evac the 10TB chassis DP, and evac SH0.

C.

Evac SH0, evac the 20TB chassis DP, install the new 91TB DP, and evac the 10TB chassis DP.

Questions # 50:

Upon completion of a hardware upgrade activity, which command should be used to unset the maintenance tag?

Options:

A.

purealert tag --cancel

B.

purealert untag --maintenance

C.

purealert --unset

Viewing page 5 out of 8 pages
Viewing questions 41-50 out of questions